This site requires Flash Player 8

Download here

     

STEP 1 - Establish fixing point.
Place hook 2.2 metres above floor level. zRAX recommends fixing hook into timber stud or masonry. Ensure there is enough room on either end to access boards.

STEP 2 - Place hanging rings on fixing point.
Make sure there are no twists in the side panel webbing.

STEP 3 - Connect PVC frame together.
Ensure the foam padded pipe is against the wall. Connect the inner fiberglass rod into the rear corner brackets. Then slide outer tubing over the corner brackets ensuring a tight connection, and repeat for front panel.

 
 
 
 
 
Sizing Chart
 
 
 
 
 
Item

Number of
Racks

Height
(mm)

Width
(mm)

Height
(inches)
Width
(inches)
Short Board
Body, Fish
Mini Mal
4
250
500
10
20

Long Board
Ski, Paddle etc.

4
300
600
12
24
Combo
4
2X250
2X300
600
10
12
24
Demonstration Video
     
© 2007 zRAX | Disclaimer | Site Map website by Dylan Conley